E-mail Alert Service:
Subscribe to Foster Wheeler's Technical Paper Alert Service to receive an e-mail alert whenever a technical paper is added to this web page.
Date Published |
Author |
Conference/ Journal |
Title |
Document Id |
| 11/30/2004 |
Lacey |
PowerGen International |
Efficient SCR Construction |
TP_SCR_04_01 |
| 09/10/2004 |
Eisinger |
Journal of Fluids and Structures |
The effect of fins on vortex shedding from a cylinder in cross-flow |
TP_VIB_04_01 |
| 07/23/2004 |
Giglio, Seshamani |
Coal Gen 2004, Kansas |
The Importance of Fluid Bed Gasification Technology |
TP_GASFY_04_04 |
| 05/28/2004 |
Venäläinen, Psik |
PowerGen Europe 2004, Barcelona, Spain |
460 MWe Supercritical CFB Boiler Design for Lagisza Power Plant |
TP_CFB_04_02 |
| 05/25/2004 |
Ilkka Venalainen |
Power-Gen Europe, Barcelona |
460 MW Supercritical CFB Boiler Design for Lagisza Power Plant |
TP_CFB_03_02 |
| 05/25/2004 |
Siewert |
PowerGen Europe, Barcelona, Spain |
Initial Operating Experience of Three New High-Efficiency Biomass Plants in Germany |
TP_CFB_04_01 |
| 05/03/2004 |
Fan |
Third Annual Conference on Carbon Capture and Sequestration |
A Novel Approach to Coal-Fired Power Generation Without CO2 Emission |
TP_CCS_04_01 |
| 01/01/2004 |
Makipaja, Ekola, Palonen, Nieminen |
|
FBG Technology for Complete Recyling of Liquid Packaging Board - Power Production and Aluminum Recovery from LPB Reject |
TP_GASFY_04_01 |
| 01/01/2004 |
Palonen, Nieminen |
|
Biomass CFB Gasifier Connected to a 350 MWth Steam Boiler Fired with Coal and Natural Gas - Thermie Demonstration Projected at Kymijarvi Chp Power Station in Lahti, Finland |
TP_GASFY_04_02 |
| 01/01/2004 |
Siro |
|
Operation Experiences from Bark Gasification for a Lime Kiln |
TP_GASFY_04_03 |
| 01/01/2004 |
Goidich |
|
Foster Wheeler Once-Through Utility (OTU) Boiler Technology |
TP_PC_04_01 |
| 01/01/2004 |
|
|
FWPG BENSON VT Boiler Process and Operational Description |
TP_PC_04_02 |